SKILL.md


name: mcp-iterative-development description: > Iteration loop management for MCP server development. Use when a phase has failed and the correct re-entry point must be determined, when deciding whether to re-enter planning versus design versus implementation, when recovering from a partial development cycle, or when repeated failures indicate a deeper structural problem. Covers re-entry decision trees, loop patterns for each failure mode, partial completion recovery, and escalation criteria.

MCP Iterative Development

Re-entry decisions and loop management across MCP SDLC phases.

Intent Router

Load reference files on demand — only when the corresponding topic is active:

  • references/re-entry-decision-tree.md — Load when determining which phase to re-enter after any failure; contains the full decision tree, loop patterns table, partial completion recovery checklist, and escalation criteria

Quick Start — Re-Entry Table

Failure ModeRe-Entry PhasePhases to Skip
Verification FAIL (schema invalid)mcp-creationmcp-planning, mcp-design
Verification FAIL (protocol error)mcp-creationmcp-planning, mcp-design
Validation FAIL M01 Discoverabilitymcp-designmcp-planning
Validation FAIL M02 Completenessmcp-designmcp-planning
Validation FAIL M03 Error Handlingmcp-creationmcp-planning, mcp-design
Validation FAIL M04 DocumentationFix in placeAll phases (no re-entry)
Validation FAIL M05 Safetymcp-creationmcp-planning, mcp-design
Validation FAIL M06 Performancemcp-creationmcp-planning, mcp-design
Test drive FAIL (wrong output)mcp-creationmcp-planning, mcp-design
Test drive FAIL (tool missing)mcp-designmcp-planning
Test drive PARTIALmcp-validation (re-score)mcp-planning through mcp-testing
Integration FAIL (connection)mcp-creation (rebuild)mcp-planning, mcp-design
Repeated M01 FAIL (2+ cycles)mcp-planning (scope split)None — full rework

Re-Entry Decision Tree

Answer these questions in order to find the correct re-entry point:

  1. Did mcp-verification fail? → Re-enter mcp-creation
  2. Did mcp-validation fail on M01 or M02? → Re-enter mcp-design
  3. Did mcp-validation fail on M03, M05, or M06? → Re-enter mcp-creation
  4. Did mcp-validation fail on M04 only? → Fix documentation in place
  5. Did test drive scenarios FAIL? → mcp-creation (wrong output) or mcp-design (missing tool)
  6. Did test drive return mostly PARTIAL? → Re-enter mcp-validation for re-scoring
  7. Did M01 fail twice after design fixes? → Re-enter mcp-planning (scope split)

Multiple simultaneous FAILs: When several dimensions fail together, apply the re-entry in the highest-priority order above. Fix code issues first (M03/M05/M06 via mcp-creation), then re-run mcp-verification and re-score mcp-validation. Fix documentation (M04) last — after code fixes pass validation — since documentation changes do not require another verification run.

Load references/re-entry-decision-tree.md for the extended version with rationale and partial completion recovery checklist.

Iterate vs Ship

Ship when:

  • mcp-verification checklist: all items PASS
  • mcp-validation verdict: APPROVE (≥5 PASS, 0 FAIL, M05 PASS)
  • mcp-test-drive: ≥5 scenarios attempted, ≥3 PASS, friction report written
  • All BLOCKED scenarios documented with infrastructure requirements

Iterate when:

  • Any mcp-verification item is FAIL
  • mcp-validation verdict: REVISE or REJECT
  • Fewer than 3 test-drive scenarios PASS
  • M05 Safety is FAIL or WARN with a confirmed vulnerability

Partial Completion Recovery

Inspect these artifacts to find the highest completed phase:

  1. Server project directory exists → mcp-planning done
  2. Tool schema list / design doc exists → mcp-design done
  3. Server starts and tools/list responds → mcp-creation done
  4. Unit tests exist and pass → mcp-testing done
  5. Verification checklist all PASS (re-run if uncertain) → mcp-verification done
  6. Client connects and tools visible → mcp-integration done
  7. Validation report with APPROVE verdict exists → mcp-validation done
  8. Friction report with ≥5 scenarios exists → mcp-test-drive done

Start from the highest confirmed completed phase.

Safety Notes

Never skip mcp-verification after any change to handler code — even documentation fixes can inadvertently alter behavior. The cost of a re-run is low; the cost of a protocol regression reaching a client is high.

Resource Index

Reference FileLoad When
references/re-entry-decision-tree.mdDetermining re-entry point; recovering partial state; escalation